About: A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.
  • Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources. (en)
Title
  • A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
  • A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling (en)
skos:prefLabel
  • A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling
  • A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling (en)
skos:notation
  • RIV/00216305:26210/09:PU86339!RIV10-MSM-26210___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • P(GA102/09/1680), Z(MSM0021630529)
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 301265
http://linked.open...ai/riv/idVysledku
  • RIV/00216305:26210/09:PU86339
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • project management, resource-constrained scheduling, NP-hard problem, CPM, heuristic method. (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...ontrolniKodProRIV
  • [10D0C42D6FAA]
http://linked.open...v/mistoKonaniAkce
  • San Francisco
http://linked.open...i/riv/mistoVydani
  • San Francisco, USA
http://linked.open...i/riv/nazevZdroje
  • World Congress on Engineering and Computer Science 2009
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...vavai/riv/projekt
http://linked.open...UplatneniVysledku
http://linked.open...iv/tvurceVysledku
  • Matoušek, Radomil
  • Pivoňka, Petr
  • Šandera, Čeněk
  • Šeda, Miloš
  • Ošmera, Pavel
http://linked.open...vavai/riv/typAkce
http://linked.open.../riv/zahajeniAkce
http://linked.open...n/vavai/riv/zamer
number of pages
http://purl.org/ne...btex#hasPublisher
  • IAENG
https://schema.org/isbn
  • 978-988-18210-2-7
http://localhost/t...ganizacniJednotka
  • 26210
is http://linked.open...avai/riv/vysledek of
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 47 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software