About: The design and construction of bridge structure erected by balanced cantilevers method situated on the Prague bypass     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • The bridge across the Berounka river valley forms a part of the new south-western part of Prague's by-pass and with its total length of more than two kilometers is one of the biggest infrastructure projects in the Czech Republic and has a great importance in calming of the traffic congestion in the capital. Three different construction methods took a part in the building of the bridge - fixed scaffolding, the overhead movable scaffold system and the balanced cantilever method using of up to four pairs of form travelers respectively, with the longest span of 114 m. The main contractor for the No. 204 and No. 205 section was Boegl and Krysl. The bridge was designed by Novak & Partner consulting company as a continuous span with the box girder section of a variable height of 2.6 to 6.5 m. Over 1500 tons of post-tensioning (PT) were installed during the course of construction in years 2008-2009. The PT contractor, VSL Systems has submitted a modified alternative of the PT in order to achieve the material savings and overall simplification. The construction process was speeded up further by using of prefabricated tendons made in the construction yard. The data about tendon forces and elongations during the stressing works were collected by the Adapt electronic system. The records were then utilized to verify the design; the theoretical friction values could be subsequently compared with the actual measurements.
  • The bridge across the Berounka river valley forms a part of the new south-western part of Prague's by-pass and with its total length of more than two kilometers is one of the biggest infrastructure projects in the Czech Republic and has a great importance in calming of the traffic congestion in the capital. Three different construction methods took a part in the building of the bridge - fixed scaffolding, the overhead movable scaffold system and the balanced cantilever method using of up to four pairs of form travelers respectively, with the longest span of 114 m. The main contractor for the No. 204 and No. 205 section was Boegl and Krysl. The bridge was designed by Novak & Partner consulting company as a continuous span with the box girder section of a variable height of 2.6 to 6.5 m. Over 1500 tons of post-tensioning (PT) were installed during the course of construction in years 2008-2009. The PT contractor, VSL Systems has submitted a modified alternative of the PT in order to achieve the material savings and overall simplification. The construction process was speeded up further by using of prefabricated tendons made in the construction yard. The data about tendon forces and elongations during the stressing works were collected by the Adapt electronic system. The records were then utilized to verify the design; the theoretical friction values could be subsequently compared with the actual measurements. (en)
Title
  • The design and construction of bridge structure erected by balanced cantilevers method situated on the Prague bypass
  • The design and construction of bridge structure erected by balanced cantilevers method situated on the Prague bypass (en)
skos:prefLabel
  • The design and construction of bridge structure erected by balanced cantilevers method situated on the Prague bypass
  • The design and construction of bridge structure erected by balanced cantilevers method situated on the Prague bypass (en)
skos:notation
  • RIV/68407700:21110/12:00204352!RIV13-GA0-21110___
http://linked.open...avai/predkladatel
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • P(GAP104/11/1301), P(GP103/08/P613), P(TA01031920)
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 130241
http://linked.open...ai/riv/idVysledku
  • RIV/68407700:21110/12:00204352
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • Balanced cantilevers construction method; creep; concrete (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...ontrolniKodProRIV
  • [169B1739234C]
http://linked.open...v/mistoKonaniAkce
  • Stresa, Laggo Magiore
http://linked.open...i/riv/mistoVydani
  • London
http://linked.open...i/riv/nazevZdroje
  • Bridge Maintenance, Safety, Management, Resilience and Sustainability
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...vavai/riv/projekt
http://linked.open...UplatneniVysledku
http://linked.open...iv/tvurceVysledku
  • Vráblík, Lukáš
  • Šístek, M.
  • Lenner, R.
  • Engler, V.
  • Hanuš, F.
http://linked.open...vavai/riv/typAkce
http://linked.open.../riv/zahajeniAkce
number of pages
http://purl.org/ne...btex#hasPublisher
  • Taylor & Francis
https://schema.org/isbn
  • 978-0-415-62124-3
http://localhost/t...ganizacniJednotka
  • 21110
is http://linked.open...avai/riv/vysledek of
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 123 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software