. "2015-05-31+02:00"^^ . "Traceability for computationally-intensive metrology" . . . . . . . "http://www.isvav.cz/projectDetail.do?rowId=7AX13008"^^ . . "7AX13008" . "0"^^ . . "Aim of this JRP is to deliver computational traceability at the point of use. Suppose a metrologist uses a software component in a measuring system, e.g. to perform a model fit to experimental data. The JRP will establish an infrastructure to allow metadata to be associated with the software component giving (a) a link to the computational aim of the software as specified in a documentary standard, and (b) the date on which the software was last validated using reference data. Then, over the internet, the measuring system will check the latest version of reference data associated with the specified computational aim. If the reference data has been updated since the last validation, the user will be given the opportunity to run the software on the latest reference data, supplied automatically over the internet, and to update the validation status. Consequently, every time the metrologist uses a software component there will be visibility of the validation or \u00B4numerical calibration\u00B4 status of the software. The infrastructure will be established in cooperation with stakeholders leading to recommendations to be adopted by national, European and international standards and accreditation bodies."@en . . "Aim of this JRP is to deliver computational traceability at the point of use. Suppose a metrologist uses a software component in a measuring system, e.g. to perform a model fit to experimental data. The JRP will establish an infrastructure to allow metadata to be associated with the software component giving (a) a link to the computational aim of the software as specified in a documentary standard, and (b) the date on which the software was last validated using reference data. Then, over the internet, the measuring system will check the latest version of reference data associated with the specified computational aim. If the reference data has been updated since the last validation, the user will be given the opportunity to run the software on the latest reference data, supplied automatically over the internet, and to update the validation status. Consequently, every time the metrologist uses a software component there will be visibility of the validation or \u00B4numerical calibration\u00B4 status of the software. The infrastructure will be established in cooperation with stakeholders leading to recommendations to be adopted by national, European and international standards and accreditation bodies." . "0"^^ . . "2015-05-28+02:00"^^ . "1"^^ . "0"^^ . "0"^^ . "2014-03-06+01:00"^^ . "2013-01-01+01:00"^^ . "Traceability for computationally-intensive metrology"@en . . . "traceability; metrology"@en . . . "traceability" . . .