"1"^^ . . "The programme project focuses on increasing the electricity transmission reliability through optimizing the structure, gathering and evaluating of the data providing the complete information on the service condition of HV and UHV components of the grid. The existing sources of operation-related information will be used and missing sources provided by means of diagnostic and monitoring techniques, the complete central data collection and automatic expert data evaluation will be carried out, including research and development focusing to the generation of recommendation on setting the priorities, procedures, scope, continuity and mutual coordination. This will be enhanced by the application of the new progressive technologies and the layout of HV and UHV installations to improve the reliability of the grid, as well as by implementing the risk evaluation system and optimizing the maintenance of HV and UHV installations within the grid oriented toward the new progressive methods of maintenance management."@en . . "In the trame of project solution the automatic central monitoring sysem for HV equipment condition assessment was created and the method of additional earthing of affected phhase was proposed to including to the standard for network operation."@en . "65"^^ . . "65"^^ . " HV disconnectors" . "2A-2TP1/051" . . . . . " power transformers" . "Zv\u00FD\u0161en\u00ED spolehlivosti a bezpe\u010Dnosti elektrick\u00FDch s\u00EDt\u00ED (Fakulta elektrotechniky a komunika\u010Dn\u00EDch technologi\u00ED)." . "Vytvo\u0159en syst\u00E9m automatick\u00E9ho centr\u00E1ln\u00EDho monitoringu stavu za\u0159\u00EDzen\u00ED vvn a zvn p\u0159enosov\u00E9 soustavy a byla navr\u017Eena \u00FAprava metodiky pro provozov\u00E1n\u00ED distribu\u010Dn\u00EDch a pr\u016Fmyslov\u00FDch s\u00EDt\u00ED o syst\u00E9m p\u0159izem\u0148ov\u00E1n\u00ED posti\u017Een\u00E9 f\u00E1ze."@cs . " HV surge arresters" . "HV equipment; HV circuit breakers; power transformers; HV instrument transformers; HV disconnectors; HV earthing switches; HV surge arresters; HV overhead lines."@en . . . "HV equipment" . "Improving Reliability and Safety of Electrical Networks."@en . "N\u00E1pln\u00ED programov\u00E9ho projektu je zv\u00FD\u0161en\u00ED spolehlivosti p\u0159enosu el. energie prost\u0159ednictv\u00EDm optimalizace struktury, sb\u011Bru a vyhodnocen\u00ED dat poskytuj\u00EDc\u00EDch \u00FApln\u00E9 informace o provozn\u00EDm stavu komponent vvn a zvn p\u0159enosov\u00E9 el. s\u00EDt\u011B. Budou vyu\u017Eity st\u00E1vaj\u00EDc\u00ED a realizov\u00E1ny chyb\u011Bj\u00EDc\u00ED zdroje provozn\u00EDch informac\u00ED prost\u0159ednictv\u00EDm nov\u00E9 diagnostick\u00E9 a monitorovac\u00ED techniky, d\u00E1le realizov\u00E1n komplexn\u00ED centr\u00E1ln\u00ED sb\u011Br a automatick\u00E9 expertn\u00ED vyhodnocen\u00ED dat, v\u010D. v\u00FDzkumu a v\u00FDvoje, kter\u00E9 povedou ke generov\u00E1n\u00ED doporu\u010Den\u00ED priorit, postup\u016F, rozsahu, n\u00E1vaznost\u00ED a vz\u00E1jemn\u00E9 koordinace. K tomu p\u0159isp\u011Bje tak\u00E9 aplikace nov\u00FDch progresivn\u00EDch technologi\u00ED a uspo\u0159\u00E1d\u00E1n\u00ED za\u0159\u00EDzen\u00ED vvn a zvn zvy\u0161uj\u00EDc\u00EDch spolehlivost p\u0159enosov\u00E9 s\u00EDt\u011B, realizace syst\u00E9mu hodnocen\u00ED rizik a realizace optimalizace \u00FAdr\u017Eby za\u0159\u00EDzen\u00ED vvn a zvn p\u0159enosov\u00E9 el. s\u00EDt\u011B orientovan\u00E9 na nov\u00E9 progresivn\u00ED metody \u0159\u00EDzen\u00ED \u00FAdr\u017Eby." . "http://www.isvav.cz/projectDetail.do?rowId=2A-2TP1/051"^^ . "2011-05-31+02:00"^^ . "5"^^ . . . . . "2007-07-01+02:00"^^ . " HV earthing switches" . . . . "2011-11-30+01:00"^^ . "0"^^ . . . . " HV instrument transformers" . "2012-07-23+02:00"^^ . " HV circuit breakers" .