This HTML5 document contains 52 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
n6http://linked.opendata.cz/ontology/domain/vavai/riv/typAkce/
dctermshttp://purl.org/dc/terms/
n19http://localhost/temp/predkladatel/
n4http://purl.org/net/nknouf/ns/bibtex#
n7http://linked.opendata.cz/resource/domain/vavai/riv/tvurce/
n11http://linked.opendata.cz/ontology/domain/vavai/
n17https://schema.org/
n14http://linked.opendata.cz/resource/domain/vavai/zamer/
shttp://schema.org/
n5http://linked.opendata.cz/ontology/domain/vavai/riv/
skoshttp://www.w3.org/2004/02/skos/core#
n2http://linked.opendata.cz/resource/domain/vavai/vysledek/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
n21http://linked.opendata.cz/resource/domain/vavai/vysledek/RIV%2F68407700%3A21230%2F10%3A00175778%21RIV11-MSM-21230___/
n13http://linked.opendata.cz/ontology/domain/vavai/riv/klicoveSlovo/
n15http://linked.opendata.cz/ontology/domain/vavai/riv/duvernostUdaju/
xsdhhttp://www.w3.org/2001/XMLSchema#
n12http://linked.opendata.cz/ontology/domain/vavai/riv/aktivita/
n9http://linked.opendata.cz/ontology/domain/vavai/riv/jazykVysledku/
n16http://linked.opendata.cz/ontology/domain/vavai/riv/obor/
n8http://linked.opendata.cz/ontology/domain/vavai/riv/druhVysledku/
n18http://reference.data.gov.uk/id/gregorian-year/

Statements

Subject Item
n2:RIV%2F68407700%3A21230%2F10%3A00175778%21RIV11-MSM-21230___
rdf:type
skos:Concept n11:Vysledek
dcterms:description
Large power system disturbances and their consequences represent a challenging problem for the power industry and especially for system operators who are responsible for the network operation, its security and reliability. This fact has reinforced interest in the new generation of monitoring systems with the aim to gain a precise and maximum knowledge about those disturbances and their impact. Most of these severe events with impact on the entire system typically occur in or near the transmission system (TS) and are therefore best monitored at TS level. This puts great demands on the equipments and in general restricts the use of the data since it becomes property of the TSO. Synchronized Phasor Measurement System has emerged as a powerful tool to improve power systems performance and reliability and fault localization possibility. An example of fault event that occurred in TS and was registered by Phasor Measurement Units installed in the distribution system will be shown. Large power system disturbances and their consequences represent a challenging problem for the power industry and especially for system operators who are responsible for the network operation, its security and reliability. This fact has reinforced interest in the new generation of monitoring systems with the aim to gain a precise and maximum knowledge about those disturbances and their impact. Most of these severe events with impact on the entire system typically occur in or near the transmission system (TS) and are therefore best monitored at TS level. This puts great demands on the equipments and in general restricts the use of the data since it becomes property of the TSO. Synchronized Phasor Measurement System has emerged as a powerful tool to improve power systems performance and reliability and fault localization possibility. An example of fault event that occurred in TS and was registered by Phasor Measurement Units installed in the distribution system will be shown.
dcterms:title
Phasor Measurement Units in Power System Monitoring Phasor Measurement Units in Power System Monitoring
skos:prefLabel
Phasor Measurement Units in Power System Monitoring Phasor Measurement Units in Power System Monitoring
skos:notation
RIV/68407700:21230/10:00175778!RIV11-MSM-21230___
n5:aktivita
n12:S n12:Z
n5:aktivity
S, Z(MSM6840770017)
n5:dodaniDat
n18:2011
n5:domaciTvurceVysledku
n7:4063120 n7:8050317 n7:2317982 n7:8064385 n7:7299532 n7:2715775 n7:1076191
n5:druhVysledku
n8:D
n5:duvernostUdaju
n15:S
n5:entitaPredkladatele
n21:predkladatel
n5:idSjednocenehoVysledku
278745
n5:idVysledku
RIV/68407700:21230/10:00175778
n5:jazykVysledku
n9:eng
n5:klicovaSlova
phasor measurement unit; wide area monitoring; power system security and reliability
n5:klicoveSlovo
n13:power%20system%20security%20and%20reliability n13:phasor%20measurement%20unit n13:wide%20area%20monitoring
n5:kontrolniKodProRIV
[72795C998B9A]
n5:mistoKonaniAkce
Praha
n5:mistoVydani
Praha
n5:nazevZdroje
Sborník konference ELEN 2010
n5:obor
n16:JE
n5:pocetDomacichTvurcuVysledku
7
n5:pocetTvurcuVysledku
7
n5:rokUplatneniVysledku
n18:2010
n5:tvurceVysledku
Švec, Jan Sýkora, Tomáš Kasembe, Andrew Gayo Šrom, Jakub Müller, Zdeněk Müller, Miroslav Tlustý, Josef
n5:typAkce
n6:EUR
n5:zahajeniAkce
2010-09-20+02:00
n5:zamer
n14:MSM6840770017
s:numberOfPages
5
n4:hasPublisher
České vysoké učení technické v Praze. Fakulta elektrotechnická. Katedra elektroenergetiky
n17:isbn
978-80-254-8089-2
n19:organizacniJednotka
21230