This HTML5 document contains 36 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dctermshttp://purl.org/dc/terms/
n14http://linked.opendata.cz/resource/domain/vavai/projekt/
n4http://linked.opendata.cz/resource/domain/vavai/riv/tvurce/
n13http://linked.opendata.cz/resource/domain/vavai/subjekt/
n12http://linked.opendata.cz/ontology/domain/vavai/
skoshttp://www.w3.org/2004/02/skos/core#
n3http://linked.opendata.cz/ontology/domain/vavai/riv/
n15http://linked.opendata.cz/resource/domain/vavai/vysledek/RIV%2F26619954%3A_____%2F12%3A%230000048%21RIV13-MV0-26619954/
n2http://linked.opendata.cz/resource/domain/vavai/vysledek/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
n9http://linked.opendata.cz/ontology/domain/vavai/riv/klicoveSlovo/
n11http://linked.opendata.cz/ontology/domain/vavai/riv/duvernostUdaju/
xsdhhttp://www.w3.org/2001/XMLSchema#
n17http://linked.opendata.cz/ontology/domain/vavai/riv/jazykVysledku/
n16http://linked.opendata.cz/ontology/domain/vavai/riv/aktivita/
n6http://linked.opendata.cz/ontology/domain/vavai/riv/druhVysledku/
n5http://linked.opendata.cz/ontology/domain/vavai/riv/obor/
n8http://reference.data.gov.uk/id/gregorian-year/

Statements

Subject Item
n2:RIV%2F26619954%3A_____%2F12%3A%230000048%21RIV13-MV0-26619954
rdf:type
skos:Concept n12:Vysledek
dcterms:description
Paper presents implementation of tools for early warning in risk management of rock fall. For effective risk management in areas of engineering geology a geomechanics, we need to apply new and highly non-standard analytic methods for modeling the time series from monitoring. These methods are based on theory of Complex Dynamic Systems or non-linear dynamics. For monitoring of rock fall close to the international route I/62 in Hrensko, it was necessary to find an effective tool for controlling of instability of the massive and early information about possible rock fall using alert messages. This tool should be fully automatised with self-decision featuring. In order to run the system in this way, it was necessary not only to install a monitoring equipment, but also to evaluate data in real time by using mathematic methods and, namely to set up rules of crisis management. Paper presents implementation of tools for early warning in risk management of rock fall. For effective risk management in areas of engineering geology a geomechanics, we need to apply new and highly non-standard analytic methods for modeling the time series from monitoring. These methods are based on theory of Complex Dynamic Systems or non-linear dynamics. For monitoring of rock fall close to the international route I/62 in Hrensko, it was necessary to find an effective tool for controlling of instability of the massive and early information about possible rock fall using alert messages. This tool should be fully automatised with self-decision featuring. In order to run the system in this way, it was necessary not only to install a monitoring equipment, but also to evaluate data in real time by using mathematic methods and, namely to set up rules of crisis management. Paper presents implementation of tools for early warning in risk management of rock fall. For effective risk management in areas of engineering geology a geomechanics, we need to apply new and highly non-standard analytic methods for modeling the time series from monitoring. These methods are based on theory of Complex Dynamic Systems or non-linear dynamics. For monitoring of rock fall close to the international route I/62 in Hrensko, it was necessary to find an effective tool for controlling of instability of the massive and early information about possible rock fall using alert messages. This tool should be fully automatised with self-decision featuring. In order to run the system in this way, it was necessary not only to install a monitoring equipment, but also to evaluate data in real time by using mathematic methods and, namely to set up rules of crisis management.
dcterms:title
Expert system and early warning against rock fall Expert system and early warning against rock fall Expert system and early warning against rock fall
skos:prefLabel
Expert system and early warning against rock fall Expert system and early warning against rock fall Expert system and early warning against rock fall
skos:notation
RIV/26619954:_____/12:#0000048!RIV13-MV0-26619954
n12:predkladatel
n13:ico%3A26619954
n3:aktivita
n16:P
n3:aktivity
P(VG20102014030)
n3:dodaniDat
n8:2013
n3:domaciTvurceVysledku
n4:6186025 n4:4004418
n3:druhVysledku
n6:O
n3:duvernostUdaju
n11:S
n3:entitaPredkladatele
n15:predkladatel
n3:idSjednocenehoVysledku
135796
n3:idVysledku
RIV/26619954:_____/12:#0000048
n3:jazykVysledku
n17:cze
n3:klicovaSlova
Expert system; Early warning; Rock fall
n3:klicoveSlovo
n9:Rock%20fall n9:Early%20warning n9:Expert%20system
n3:kontrolniKodProRIV
[CAC843BFB826]
n3:obor
n5:IN
n3:pocetDomacichTvurcuVysledku
2
n3:pocetTvurcuVysledku
2
n3:projekt
n14:VG20102014030
n3:rokUplatneniVysledku
n8:2012
n3:tvurceVysledku
Nechyba, M. Zvelebil, J.