This HTML5 document contains 45 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
dctermshttp://purl.org/dc/terms/
n15http://localhost/temp/predkladatel/
n9http://linked.opendata.cz/resource/domain/vavai/riv/tvurce/
n17http://linked.opendata.cz/resource/domain/vavai/subjekt/
n16http://linked.opendata.cz/ontology/domain/vavai/
shttp://schema.org/
skoshttp://www.w3.org/2004/02/skos/core#
n3http://linked.opendata.cz/ontology/domain/vavai/riv/
n13http://linked.opendata.cz/resource/domain/vavai/vysledek/RIV%2F00216305%3A26110%2F13%3APU103981%21RIV14-MSM-26110___/
n2http://linked.opendata.cz/resource/domain/vavai/vysledek/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
n4http://linked.opendata.cz/ontology/domain/vavai/riv/klicoveSlovo/
n12http://linked.opendata.cz/ontology/domain/vavai/riv/duvernostUdaju/
xsdhhttp://www.w3.org/2001/XMLSchema#
n14http://linked.opendata.cz/ontology/domain/vavai/riv/jazykVysledku/
n5http://linked.opendata.cz/ontology/domain/vavai/riv/aktivita/
n18http://linked.opendata.cz/ontology/domain/vavai/riv/druhVysledku/
n6http://linked.opendata.cz/ontology/domain/vavai/riv/obor/
n11http://reference.data.gov.uk/id/gregorian-year/

Statements

Subject Item
n2:RIV%2F00216305%3A26110%2F13%3APU103981%21RIV14-MSM-26110___
rdf:type
skos:Concept n16:Vysledek
dcterms:description
Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article. Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.
dcterms:title
FORMWORK DEMANDS ON CRANE OPERATION FORMWORK DEMANDS ON CRANE OPERATION
skos:prefLabel
FORMWORK DEMANDS ON CRANE OPERATION FORMWORK DEMANDS ON CRANE OPERATION
skos:notation
RIV/00216305:26110/13:PU103981!RIV14-MSM-26110___
n16:predkladatel
n17:orjk%3A26110
n3:aktivita
n5:S
n3:aktivity
S
n3:cisloPeriodika
2
n3:dodaniDat
n11:2014
n3:domaciTvurceVysledku
n9:7964099 n9:6128726 n9:4823133 n9:6464963
n3:druhVysledku
n18:J
n3:duvernostUdaju
n12:S
n3:entitaPredkladatele
n13:predkladatel
n3:idSjednocenehoVysledku
75557
n3:idVysledku
RIV/00216305:26110/13:PU103981
n3:jazykVysledku
n14:eng
n3:klicovaSlova
Operation, element, system, construction, transfer.
n3:klicoveSlovo
n4:Operation n4:transfer. n4:system n4:element n4:construction
n3:kodStatuVydavatele
BG - Bulharská republika
n3:kontrolniKodProRIV
[7D235C99361D]
n3:nazevZdroje
Journal of International Scientific Publications: Ecology & Safety
n3:obor
n6:JN
n3:pocetDomacichTvurcuVysledku
4
n3:pocetTvurcuVysledku
4
n3:rokUplatneniVysledku
n11:2013
n3:svazekPeriodika
7
n3:tvurceVysledku
Štěrba, Martin Motyčka, Vít Venkrbec, Václav Čech, David
s:issn
1313-2563
s:numberOfPages
7
n15:organizacniJednotka
26110