This HTML5 document contains 39 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

Namespace Prefixes

PrefixIRI
n19http://linked.opendata.cz/ontology/domain/vavai/cep/typPojektu/
n21http://linked.opendata.cz/ontology/domain/vavai/cep/druhSouteze/
n13http://linked.opendata.cz/ontology/domain/vavai/cep/zivotniCyklusProjektu/
n12http://linked.opendata.cz/ontology/domain/vavai/cep/hodnoceniProjektu/
dctermshttp://purl.org/dc/terms/
n2http://linked.opendata.cz/resource/domain/vavai/projekt/
n22http://linked.opendata.cz/resource/domain/vavai/cep/prideleniPodpory/
n6http://linked.opendata.cz/resource/domain/vavai/subjekt/
n15http://linked.opendata.cz/ontology/domain/vavai/
n10http://linked.opendata.cz/ontology/domain/vavai/cep/kategorie/
n16http://linked.opendata.cz/ontology/domain/vavai/cep/duvernostUdaju/
skoshttp://www.w3.org/2004/02/skos/core#
rdfshttp://www.w3.org/2000/01/rdf-schema#
n20http://linked.opendata.cz/ontology/domain/vavai/cep/fazeProjektu/
n7http://linked.opendata.cz/ontology/domain/vavai/cep/obor/
n17http://linked.opendata.cz/resource/domain/vavai/soutez/
n18http://linked.opendata.cz/ontology/domain/vavai/cep/statusZobrazovaneFaze/
n11http://linked.opendata.cz/resource/domain/vavai/projekt/GP105%2F09%2FP277/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
xsdhhttp://www.w3.org/2001/XMLSchema#
n4http://linked.opendata.cz/ontology/domain/vavai/cep/
n14http://reference.data.gov.uk/id/gregorian-year/
n5http://linked.opendata.cz/resource/domain/vavai/aktivita/

Statements

Subject Item
n2:GP105%2F09%2FP277
rdf:type
n15:Projekt
rdfs:seeAlso
http://www.isvav.cz/projectDetail.do?rowId=GP105/09/P277
dcterms:description
- vyhodnotit průběh porušování pevného nadloží dobývaných slojí na základě časoprostorového hodnocení poklesů povrchu vzhledem k dobývání a charakteru nadložních hornin - zobecnit závislost mezi rozsahem odrubané plochy a charakterem nadloží hodnocených případů The grant project is focused on problems of formation of subsidence troughs depending upon the character of rock mass and the extent of mining by using the method of longwall working along the strike with controlled caving. The urgency of the subject comes from the needs of practice and efforts to apply a simple principle of observation to the assessment of condition of failure of a firm roof influenced by underlying workings, which is periodical measurement of height of surface of undermined mass. To specify the failure of rock mass behind the advancing face, other procedures can be used, e.g. dynamometric measurements in the worked-out space; however, these are too expensive. This fact leads to the necessity to use commonly made measurements that are part of mining impact observation for the assessment of condition of failure of the firm roof. A possibility of using the periodical height measurement for this purpose was already shown in the dissertation of the applicant. The dissertation was processed in the framework of one locality. For practical use, it is necessary to carry out the assessment on the basis of sufficient number of localities so that achieved results draw a general conclusion. The grant project will be thus orientated  towards the processing of results from selected areas with the aim to propose practical uses for the assessment of prediction condition of failure of undermined firm roof.
dcterms:title
Časoprostorové vytváření poklesové kotliny v závislosti na charakteru horského masivu a dřívější hornické činnosti Dynamics configuration of subsidence trough in dependence on charakteristics of rock mass and previous mining activity
skos:notation
GP105/09/P277
n4:aktivita
n5:GP
n4:celkovaStatniPodpora
n11:celkovaStatniPodpora
n4:celkoveNaklady
n11:celkoveNaklady
n4:datumDodatniDoRIV
2015-03-02+01:00
n4:druhSouteze
n21:VS
n4:duvernostUdaju
n16:S
n4:fazeProjektu
n20:91732185
n4:hlavniObor
n7:DE
n4:hodnoceniProjektu
n12:V
n4:kategorie
n10:ZV
n4:klicovaSlova
poklesová kotlina, horský masiv
n4:partnetrHlavni
n6:orjk%3A27350
n4:pocetKoordinujicichPrijemcu
0
n4:pocetPrijemcu
1
n4:pocetSpoluPrijemcu
0
n4:pocetVysledkuRIV
10
n4:pocetZverejnenychVysledkuVRIV
10
n4:posledniUvolneniVMinulemRoce
2011-04-16+02:00
n4:prideleniPodpory
n22:105%2F09%2FP277
n4:sberDatUcastniciPoslednihoRoku
n14:2011
n4:sberDatUdajeProjZameru
n14:2012
n4:soutez
n17:SGA02009GA1PD
n4:statusZobrazovaneFaze
n18:DUU
n4:typPojektu
n19:P
n4:ukonceniReseni
2011-12-31+01:00
n4:vedlejsiObor
n7:DB n7:DH
n4:zahajeniReseni
2009-01-01+01:00
n4:zhodnoceni+vysledku+projektu+dodavatelem
The project was excellent, both in terms of expertise and in terms of disbursement of funds. Řešení projektu proběhlo na vynikající úrovni, a to jak z hlediska odborného tak i z hlediska čerpání finančních prostředků.
n4:zivotniCyklusProjektu
n13:ZBKU
n4:klicoveSlovo
poklesová kotlina