About: Bottleneck Management in Discrete Batch Production     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • Today, production planning and scheduling becomes very important part of production management because companies have to react to dynamic market conditions and rising customers´ requirements for shorter delivery times, lower prices and better quality and services. They can use a lot of sophisticated methods and approaches to make their planning processes more efficient and thus meet growing customers´ requirements. However, using these new approaches is not so easy in all types of production systems. This paper deals with production planning and scheduling in discrete batch production that is just an example of very complicated production system. This type of production process is susceptible to demand fluctuation and facility exceptions and this implies bottleneck shifting. Therefore it is quite difficult to implement methods such as Theory of Constraints (TOC) for production planning improvement in the standard way. One part of this paper is a case study wherecurrent production planning and scheduling in real factory is improved just through the use TOC principles.
  • Today, production planning and scheduling becomes very important part of production management because companies have to react to dynamic market conditions and rising customers´ requirements for shorter delivery times, lower prices and better quality and services. They can use a lot of sophisticated methods and approaches to make their planning processes more efficient and thus meet growing customers´ requirements. However, using these new approaches is not so easy in all types of production systems. This paper deals with production planning and scheduling in discrete batch production that is just an example of very complicated production system. This type of production process is susceptible to demand fluctuation and facility exceptions and this implies bottleneck shifting. Therefore it is quite difficult to implement methods such as Theory of Constraints (TOC) for production planning improvement in the standard way. One part of this paper is a case study wherecurrent production planning and scheduling in real factory is improved just through the use TOC principles. (en)
Title
  • Bottleneck Management in Discrete Batch Production
  • Bottleneck Management in Discrete Batch Production (en)
skos:prefLabel
  • Bottleneck Management in Discrete Batch Production
  • Bottleneck Management in Discrete Batch Production (en)
skos:notation
  • RIV/70883521:28120/12:43867858!RIV13-MSM-28120___
http://linked.open...avai/predkladatel
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • S
http://linked.open...iv/cisloPeriodika
  • 2
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 125419
http://linked.open...ai/riv/idVysledku
  • RIV/70883521:28120/12:43867858
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • bottleneck management, bottleneck shiftiness, production planning, Theory of Constraints, TOC, capacity planning, Drum-Buffer-Rope (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [C5D3F44BB1B3]
http://linked.open...i/riv/nazevZdroje
  • Journal of Competitiveness
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 4
http://linked.open...iv/tvurceVysledku
  • Ferenčíková, Denisa
issn
  • 1804-171X
number of pages
http://bibframe.org/vocab/doi
  • 10.7441/joc.2012.02.11
http://localhost/t...ganizacniJednotka
  • 28120
is http://linked.open...avai/riv/vysledek of
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 36 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software