About: Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • We study the RCPSP problem with alternative process plans where the goal is to minimize the total changeover cost given by all performed changeovers. A special attention is paid to the model that includes deadlines and covers a possibility to define more alternative ways how to complete the project. A selection of activities present in the schedule influences both decision (finding a feasible schedule) and optimization problem. We propose a heuristic based on local search that is performed in a shifting time window. The heuristic is able to handle large scale instances in an efficient manner.
  • We study the RCPSP problem with alternative process plans where the goal is to minimize the total changeover cost given by all performed changeovers. A special attention is paid to the model that includes deadlines and covers a possibility to define more alternative ways how to complete the project. A selection of activities present in the schedule influences both decision (finding a feasible schedule) and optimization problem. We propose a heuristic based on local search that is performed in a shifting time window. The heuristic is able to handle large scale instances in an efficient manner. (en)
Title
  • Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization
  • Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization (en)
skos:prefLabel
  • Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization
  • Resource constrained project scheduling problem with alternative process plans and total changeover cost minimization (en)
skos:notation
  • RIV/68407700:21230/12:00194256!RIV13-GA0-21230___
http://linked.open...avai/predkladatel
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • P(GAP103/12/1994)
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 165245
http://linked.open...ai/riv/idVysledku
  • RIV/68407700:21230/12:00194256
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • Scheduling; Project scheduling; Alternative proces plans; Changeover times; Heuristics (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...ontrolniKodProRIV
  • [4CBA90574635]
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...vavai/riv/projekt
http://linked.open...UplatneniVysledku
http://linked.open...iv/tvurceVysledku
  • Čapek, Roman
http://localhost/t...ganizacniJednotka
  • 21230
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software