Attributes | Values |
---|
rdf:type
| |
Description
| - This entry presents basic information on the project of the newly constructed metro in the city of Chennai, India. The first phase of the project expects that two lines with total length 45,1 km of the route will be constructed, with 24 km running underground. This entry is focuses on the design of cross-passages and ground treatment and specifics of the design and construction in Indian conditions (e.g. geotechnical conditions and their different interpretation, climatic conditions, seismic design, etc.).
- This entry presents basic information on the project of the newly constructed metro in the city of Chennai, India. The first phase of the project expects that two lines with total length 45,1 km of the route will be constructed, with 24 km running underground. This entry is focuses on the design of cross-passages and ground treatment and specifics of the design and construction in Indian conditions (e.g. geotechnical conditions and their different interpretation, climatic conditions, seismic design, etc.). (en)
- This entry presents basic information on the project of the newly constructed metro in the city of Chennai, India. The first phase of the project expects that two lines with total length 45,1 km of the route will be constructed, with 24 km running underground. This entry is focuses on the design of cross-passages and ground treatment and specifics of the design and construction in Indian conditions (e.g. geotechnical conditions and their different interpretation, climatic conditions, seismic design, etc.). (cs)
|
Title
| - Design and construction of Chennai metro, Indie (en)
- Návrh a výstavba podzemní dráhy Chennai, Indie
- Návrh a výstavba podzemní dráhy Chennai, Indie (cs)
|
skos:prefLabel
| - Design and construction of Chennai metro, Indie (en)
- Návrh a výstavba podzemní dráhy Chennai, Indie
- Návrh a výstavba podzemní dráhy Chennai, Indie (cs)
|
skos:notation
| - RIV/68407700:21110/12:00208318!RIV15-MSM-21110___
|
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/68407700:21110/12:00208318
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - Design; Construction; Metro; TBM; NRTM (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...v/mistoKonaniAkce
| |
http://linked.open...i/riv/mistoVydani
| |
http://linked.open...i/riv/nazevZdroje
| - 40. ročník konference Zakládání staveb Brno 2012
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...iv/tvurceVysledku
| - Polák, Barnabás
- Čeněk, J.
|
http://linked.open...vavai/riv/typAkce
| |
http://linked.open.../riv/zahajeniAkce
| |
number of pages
| |
http://purl.org/ne...btex#hasPublisher
| |
https://schema.org/isbn
| |
http://localhost/t...ganizacniJednotka
| |