Attributes | Values |
---|
rdf:type
| |
Description
| - This paper describes the flood warning process and its two main parts that are concerned with correctly predicting the potentially coming flood and issuing correct and quick response based on this warning. In order to correctly predict the magnitude of the flood, the hydrometeorology specialists in the process have to be adequately skilled, but process simulation models are not very concerned with accurate human resources modelling. A method for the description of human resources’ skills in process simulations is proposed and used to extend the discrete event process simulation method called the BPM Method. This method is then used for modelling and simulation of the flood warning process to identify sections that cause the greatest delay and to propose improvements to the number and skill sets of specialists in the process.
- This paper describes the flood warning process and its two main parts that are concerned with correctly predicting the potentially coming flood and issuing correct and quick response based on this warning. In order to correctly predict the magnitude of the flood, the hydrometeorology specialists in the process have to be adequately skilled, but process simulation models are not very concerned with accurate human resources modelling. A method for the description of human resources’ skills in process simulations is proposed and used to extend the discrete event process simulation method called the BPM Method. This method is then used for modelling and simulation of the flood warning process to identify sections that cause the greatest delay and to propose improvements to the number and skill sets of specialists in the process. (en)
|
Title
| - Simulation of the Flood Warning Process with Competency Based Description of Human Resources
- Simulation of the Flood Warning Process with Competency Based Description of Human Resources (en)
|
skos:prefLabel
| - Simulation of the Flood Warning Process with Competency Based Description of Human Resources
- Simulation of the Flood Warning Process with Competency Based Description of Human Resources (en)
|
skos:notation
| - RIV/61989100:27200/12:86084902!RIV14-TA0-27200___
|
http://linked.open...avai/predkladatel
| |
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| - I, P(ED1.1.00/02.0070), P(TA01021374)
|
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/61989100:27200/12:86084902
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - discrete event process simulation, flood warning process, human resource competency model, BPM Method (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...v/mistoKonaniAkce
| |
http://linked.open...i/riv/mistoVydani
| |
http://linked.open...i/riv/nazevZdroje
| - The 11th International Conference on Modeling and Applied Simulation, MAS 2012 : September 19-21 2012, Vienna, Austria
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...vavai/riv/projekt
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...iv/tvurceVysledku
| - Kuchař, Štěpán
- Martinovič, Jan
- Podhorányi, Michal
- Vondrák, Ivo
|
http://linked.open...vavai/riv/typAkce
| |
http://linked.open.../riv/zahajeniAkce
| |
number of pages
| |
http://purl.org/ne...btex#hasPublisher
| - DIME Università Di Genova
|
https://schema.org/isbn
| |
http://localhost/t...ganizacniJednotka
| |