Attributes | Values |
---|
rdf:type
| |
Description
| - While in our previous works we have tried to deal with theoretic aspects of production planning and scheduling of multiproduct batch plants, this time we have tried to apply our results onto problem of scheduling of production of precipitated catalysts. Our preliminary results are satisfactory. The optimization algorithm works well and the computation is sufficiently fast.The software we created covers the manufacture of 13 different catalysts. The technologies differ significantly in types of operations performed, sequences of these operations, and types of apparatuses used. The production includes precipitated catalysts, supported catalysts on both bought and self-produced supports, and the supports themselves. In some cases, the operation is performed simultaneously in several apparatuses; in some other cases it is necessary to choose one apparatus from a selection of apparatuses usable for a given operation.
- While in our previous works we have tried to deal with theoretic aspects of production planning and scheduling of multiproduct batch plants, this time we have tried to apply our results onto problem of scheduling of production of precipitated catalysts. Our preliminary results are satisfactory. The optimization algorithm works well and the computation is sufficiently fast.The software we created covers the manufacture of 13 different catalysts. The technologies differ significantly in types of operations performed, sequences of these operations, and types of apparatuses used. The production includes precipitated catalysts, supported catalysts on both bought and self-produced supports, and the supports themselves. In some cases, the operation is performed simultaneously in several apparatuses; in some other cases it is necessary to choose one apparatus from a selection of apparatuses usable for a given operation. (en)
|
Title
| - Planning and Scheduling of Batch Processes III
- Planning and Scheduling of Batch Processes III (en)
|
skos:prefLabel
| - Planning and Scheduling of Batch Processes III
- Planning and Scheduling of Batch Processes III (en)
|
skos:notation
| - RIV/60461373:22340/01:00003863!RIV/2004/MSM/223404/N
|
http://linked.open.../vavai/riv/strany
| |
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/60461373:22340/01:00003863
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - precipitated catalysts; scheduling; multiproduct batch plant (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...v/mistoKonaniAkce
| - Podbanské, High Tatras, Slovakia
|
http://linked.open...i/riv/mistoVydani
| |
http://linked.open...i/riv/nazevZdroje
| - Proc. of the 1st Int. Conf. LOADO 2001
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...ocetUcastnikuAkce
| |
http://linked.open...nichUcastnikuAkce
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...iv/tvurceVysledku
| - Poživil, Jaroslav
- Žďánský, Martin
|
http://linked.open...vavai/riv/typAkce
| |
http://linked.open.../riv/zahajeniAkce
| |
http://linked.open...n/vavai/riv/zamer
| |
number of pages
| |
http://purl.org/ne...btex#hasPublisher
| |
https://schema.org/isbn
| |
http://localhost/t...ganizacniJednotka
| |