About: Project costs planning in the conditions of uncertainty     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • The fuzzy approach to the project network analysis of the project planning and control is commonly oriented on the fuzzy critical path setting and the project duration monitoring. In the article, this approach is improved by the addition of the project costs perspective to the standard time aspect. The relations for the fuzzy quantity of the total project costs and for its membership function are derived. The example demonstrates the application of the theoretical relations and shows how the enhanced fuzzy approach can be used when different project variants are to be compared. The example also reveals how the fuzzy approach with the project costs monitoring brings new information for the project planning and management and for the risk management.
  • The fuzzy approach to the project network analysis of the project planning and control is commonly oriented on the fuzzy critical path setting and the project duration monitoring. In the article, this approach is improved by the addition of the project costs perspective to the standard time aspect. The relations for the fuzzy quantity of the total project costs and for its membership function are derived. The example demonstrates the application of the theoretical relations and shows how the enhanced fuzzy approach can be used when different project variants are to be compared. The example also reveals how the fuzzy approach with the project costs monitoring brings new information for the project planning and management and for the risk management. (en)
Title
  • Project costs planning in the conditions of uncertainty
  • Project costs planning in the conditions of uncertainty (en)
skos:prefLabel
  • Project costs planning in the conditions of uncertainty
  • Project costs planning in the conditions of uncertainty (en)
skos:notation
  • RIV/60460709:41110/12:55667!RIV13-MSM-41110___
http://linked.open...avai/predkladatel
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • S
http://linked.open...iv/cisloPeriodika
  • 2
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 162687
http://linked.open...ai/riv/idVysledku
  • RIV/60460709:41110/12:55667
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • project planning and management, fuzzy methods, simulations of uncertainty, costs planning, project costs, project network analysis, critical path, risk management, support for decisions, project variants (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [A17D95F3AD0E]
http://linked.open...i/riv/nazevZdroje
  • Agricultural Economics (Zemědělská ekonomika)
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 58 (2012)
http://linked.open...iv/tvurceVysledku
  • Štiková, Hana
http://linked.open...ain/vavai/riv/wos
  • 0
issn
  • 0139-570X
number of pages
http://localhost/t...ganizacniJednotka
  • 41110
is http://linked.open...avai/riv/vysledek of
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software