Attributes | Values |
---|
rdf:type
| |
Description
| - In this paper, two different approaches to permutation flow shop scheduling problem are investigated. The first one is based on a mixed integer programming model and is solved by an optimization package GAMS. As the problem belongs to NP-complete problems, this approach is limited to smaller instances, its reasonable bounds are indicated using benchmarks from OR-Library. For large instances, an approach using genetic algorithm is proposed including its appropriate parameter settings. Finally, a modificaation of the problem using uncertain processing times of jobs is presented.
- In this paper, two different approaches to permutation flow shop scheduling problem are investigated. The first one is based on a mixed integer programming model and is solved by an optimization package GAMS. As the problem belongs to NP-complete problems, this approach is limited to smaller instances, its reasonable bounds are indicated using benchmarks from OR-Library. For large instances, an approach using genetic algorithm is proposed including its appropriate parameter settings. Finally, a modificaation of the problem using uncertain processing times of jobs is presented. (en)
- V příspěvku jsou zkoumány dva různé přístupy k řešení permutačního problému rozvrhování proudové výroby. První z nich je vychází z modelu smíšeného celočíselného programováním a je řešen v optimalizačním programu GAMS. Protože problém patří mezi NP-úplné, je tento přístup omezen na menší instance. Hranice řešitelnosti jsou indikovány pomocí testovacích úloh z OR-Library. Pro větší instance je navržen přístup využívající genetický algoritmus včetně vhodného nastavení jeho parametrů. Nakonec je ještě prezzentována modifikace problému pro případ úloh s neurčitými časy provedení jejich operací. (cs)
|
Title
| - Scheduling Flow Shops
- Rozvrhování proudové výroby (cs)
- Scheduling Flow Shops (en)
|
skos:prefLabel
| - Scheduling Flow Shops
- Rozvrhování proudové výroby (cs)
- Scheduling Flow Shops (en)
|
skos:notation
| - RIV/00216305:26210/05:PU53766!RIV06-MSM-26210___
|
http://linked.open.../vavai/riv/strany
| |
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/00216305:26210/05:PU53766
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - flow shop, mixed integer programming, heuristic, genetic algorithm (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...v/mistoKonaniAkce
| |
http://linked.open...i/riv/mistoVydani
| |
http://linked.open...i/riv/nazevZdroje
| - Proceedings of the International Conference CEEPUS Summer School 2005 Intelligent Control Systems
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...iv/tvurceVysledku
| |
http://linked.open...vavai/riv/typAkce
| |
http://linked.open.../riv/zahajeniAkce
| |
http://linked.open...n/vavai/riv/zamer
| |
number of pages
| |
http://purl.org/ne...btex#hasPublisher
| - Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
|
https://schema.org/isbn
| |
http://localhost/t...ganizacniJednotka
| |
is http://linked.open...avai/riv/vysledek
of | |