This contribution deals with observation of motorway bridge construction over the Odra river in Ostrava. It is five-field composite bridge with the largest span 99,5 m of the middle field. The main aim of observation of bridge construction is verification of real behaviour of building in three selected sections on every single construction situation and comaprison real values of measured parameters with designed values. (en)