  • A Construction and Engineering industry is a high risk industry. Management of the risks has overridingimportance and every risk must be allocated to one or other party. Practice over many years has shownthat sensible and balanced risk allocation results in the lowest overall total cost for completed projects.Common delivery methods such as General Contracting or Design-Bid-Build (often abbreviated as D/B/B),Design-Build (often abbreviated as D/B) including EPC (Engineer-Procure-Construct), and Construction Management (often abbreviated as CM), including CM At-Risk and EPCM (Engineer-Procure-ConstructionManagement) and their key aspects such as Contract Price, Design Responsibility and Contract Administrationcreate a basis of Risk Allocation.Claim Management is a system for early solution of problems, obstructions and complications that helpsreflect realized risk in Contract price and in Time for Completion.The Fédération Internationale des Ingénieurs-Conseils (International Federation of Consulting Engineers) was founded in 1913 and the number of FIDIC associations worldwide is nearing to almost 100. FIDIC publish different best practise documents including sample forms of contracts for works that are known for balancedrisk allocation and efficient Claim management system.
  • A Construction and Engineering industry is a high risk industry. Management of the risks has overridingimportance and every risk must be allocated to one or other party. Practice over many years has shownthat sensible and balanced risk allocation results in the lowest overall total cost for completed projects.Common delivery methods such as General Contracting or Design-Bid-Build (often abbreviated as D/B/B),Design-Build (often abbreviated as D/B) including EPC (Engineer-Procure-Construct), and Construction Management (often abbreviated as CM), including CM At-Risk and EPCM (Engineer-Procure-ConstructionManagement) and their key aspects such as Contract Price, Design Responsibility and Contract Administrationcreate a basis of Risk Allocation.Claim Management is a system for early solution of problems, obstructions and complications that helpsreflect realized risk in Contract price and in Time for Completion.The Fédération Internationale des Ingénieurs-Conseils (International Federation of Consulting Engineers) was founded in 1913 and the number of FIDIC associations worldwide is nearing to almost 100. FIDIC publish different best practise documents including sample forms of contracts for works that are known for balancedrisk allocation and efficient Claim management system. (en)
Title
  • Delivery methods under FIDIC forms of contract
  • Delivery methods under FIDIC forms of contract (en)
skos:prefLabel
  • Delivery methods under FIDIC forms of contract
  • Delivery methods under FIDIC forms of contract (en)
skos:notation
  • RIV/00216208:11220/13:10139082!RIV14-MSM-11220___
http://linked.open...avai/predkladatel
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • I
http://linked.open...iv/cisloPeriodika
  • 2
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 68284
http://linked.open...ai/riv/idVysledku
  • RIV/00216208:11220/13:10139082
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • contract; forms; FIDIC; under; methods; Delivery (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [6B7CC3CDA9F4]
http://linked.open...i/riv/nazevZdroje
  • The Lawyer Quarterly: International Journal for Legal Research
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 3
http://linked.open...iv/tvurceVysledku
  • Klee, Lukáš
issn
  • 1805-8396
number of pages
http://localhost/t...ganizacniJednotka
  • 11220
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software