Attributes | Values |
---|
rdf:type
| |
rdfs:seeAlso
| |
Description
| - The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR-15 research reactor in Czech Republic in the future. All necessary documents required for licensing of the FQT facility by the Czech regulator shall be the outcome of this project. Pre-qualification of the FQT facility will be carried out in China. Testing of a limited amount of commercially available nuclear grade materials, which are candidates for fuel cladding, will be carried out within this project as well. The European-Chinese team behind this project has been formed during a meeting held in Rez, Czech Republic, in October 2009; the wider EU-China scientific collaboration, together with its legal aspects, has been discussed during the seminar held in Beijing in March, 2010. (en)
- The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR-15 research reactor in Czech Republic in the future. All necessary documents required for licensing of the FQT facility by the Czech regulator shall be the outcome of this project. Pre-qualification of the FQT facility will be carried out in China. Testing of a limited amount of commercially available nuclear grade materials, which are candidates for fuel cladding, will be carried out within this project as well. The European-Chinese team behind this project has been formed during a meeting held in Rez, Czech Republic, in October 2009; the wider EU-China scientific collaboration, together with its legal aspects, has been discussed during the seminar held in Beijing in March, 2010.
|
Title
| - Supercritical Water Reactor - Fuel Qualification Test (en)
- Supercritical Water Reactor - Fuel Qualification Test
|
skos:notation
| |
http://linked.open...avai/cep/aktivita
| |
http://linked.open...kovaStatniPodpora
| |
http://linked.open...ep/celkoveNaklady
| |
http://linked.open...datumDodatniDoRIV
| |
http://linked.open...i/cep/druhSouteze
| |
http://linked.open...ep/duvernostUdaju
| |
http://linked.open.../cep/fazeProjektu
| |
http://linked.open...ai/cep/hlavniObor
| |
http://linked.open...hodnoceniProjektu
| |
http://linked.open...vai/cep/kategorie
| |
http://linked.open.../cep/klicovaSlova
| - Supercritical Water Reactor; fuel qualification; experimental facility; licensing documents (en)
|
http://linked.open...ep/partnetrHlavni
| |
http://linked.open...inujicichPrijemcu
| |
http://linked.open...cep/pocetPrijemcu
| |
http://linked.open...ocetSpoluPrijemcu
| |
http://linked.open.../pocetVysledkuRIV
| |
http://linked.open...enychVysledkuVRIV
| |
http://linked.open...lneniVMinulemRoce
| |
http://linked.open.../prideleniPodpory
| |
http://linked.open...iciPoslednihoRoku
| |
http://linked.open...atUdajeProjZameru
| |
http://linked.open...usZobrazovaneFaze
| |
http://linked.open...ai/cep/typPojektu
| |
http://linked.open...ep/ukonceniReseni
| |
http://linked.open.../cep/vedlejsiObor
| |
http://linked.open...ep/zahajeniReseni
| |
http://linked.open...jektu+dodavatelem
| - Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider. (en)
- Hodnocení výsledků řešení ministerstvo neprovádí, neboť podmínkou podpory je, že uchazeč byl vybrán mezinárodním poskytovatelem v souladu s pravidly příslušného programu. Projekt je hodnocen až po jeho schválení mezinárodním poskytovatelem. (cs)
|
http://linked.open...tniCyklusProjektu
| |
http://linked.open.../cep/klicoveSlovo
| - experimental facility
- fuel qualification
- Supercritical Water Reactor
|
is http://linked.open...vavai/riv/projekt
of | |
is http://linked.open...vavai/cep/projekt
of | |