| - This paper deals with a scheduling problem with alternative process plans that was motivated by a production of wire harnesses where certain parts can be processed manually or automatically by different types of machines. Only a subset of all the given activities will form the solution, so the decision whether the activity will appear in the final schedule has to be made during the scheduling process. We extend classic RCPSP problem by a definition of alternative branchings, represented by the Petri nets formalism allowing one to define alternatives and parallelism within one data structure. For this representation of the problem, an integer linear programming model is formulated and the reduction of the problem, using time symmetry mapping, is shown. Finally, a heuristic algorithm based on priority schedule construction with an unscheduling step is proposed for the nested version of the problem and it is used to solve the case study of the wire harnesses production.
- This paper deals with a scheduling problem with alternative process plans that was motivated by a production of wire harnesses where certain parts can be processed manually or automatically by different types of machines. Only a subset of all the given activities will form the solution, so the decision whether the activity will appear in the final schedule has to be made during the scheduling process. We extend classic RCPSP problem by a definition of alternative branchings, represented by the Petri nets formalism allowing one to define alternatives and parallelism within one data structure. For this representation of the problem, an integer linear programming model is formulated and the reduction of the problem, using time symmetry mapping, is shown. Finally, a heuristic algorithm based on priority schedule construction with an unscheduling step is proposed for the nested version of the problem and it is used to solve the case study of the wire harnesses production. (en)
|
Title
| - Production Scheduling with Alternative Process Plans
- Production Scheduling with Alternative Process Plans (en)
|
skos:prefLabel
| - Production Scheduling with Alternative Process Plans
- Production Scheduling with Alternative Process Plans (en)
|
skos:notation
| - RIV/68407700:21230/12:00182616!RIV13-MSM-21230___
|
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| - P(ME10039), P(OE09004), Z(MSM6840770038)
|
http://linked.open...iv/cisloPeriodika
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/68407700:21230/12:00182616
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - Scheduling; alternatives; Petri nets; production; integer linear programming (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...odStatuVydavatele
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...i/riv/nazevZdroje
| - European Journal of Operational Research
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...vavai/riv/projekt
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...v/svazekPeriodika
| |
http://linked.open...iv/tvurceVysledku
| - Hanzálek, Zdeněk
- Šůcha, Přemysl
- Čapek, Roman
|
http://linked.open...ain/vavai/riv/wos
| |
http://linked.open...n/vavai/riv/zamer
| |
issn
| |
number of pages
| |
http://bibframe.org/vocab/doi
| - 10.1016/j.ejor.2011.09.018
|
http://localhost/t...ganizacniJednotka
| |