About: Life cycle costs of engineering works     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • Life cycle costs in the operational phase of investments tend to be higher than investment costs for the acquisition of an engineering project. A specific feature of engineering projects is the absence of a clear calculation of the return function for the life cycle period of an engineering work. Thus, the rules of classic investment economy reach the level of expert estimates of potential efficiency. These issues relate, above all, to municipal, communal or regional decisions on the infrastructure of transport or other facilities necessary for the actual or hypothetical development of industry, housing, etc. A similar situation applies to the cost curve for the life cycle period of engineering projects. This curve, however, may be reached more easily and may be plotted with greater credibility. (en)
  • Náklady životního cyklu v provozní fázi investic jsou obvykle vyšší než pořizovací investiční náklady stavebního inženýrského díla. Specifikem inženýrských projektů bývá absence přehledné kalkulace výnosové funkce za dobu životnosti stavebního díla. Pravidla klasické ekonomiky investic se tak dostávají do úrovně expertních odhadů potenciální efektivnosti. Problematika se týká zejména obecních komunálních nebo regionálních rozhodnutí o infrastruktuře dopravních a jiných staveb potřebných pro faktický nebo hypotetický rozvoj průmyslu, bydlení apod. Obdobná situace nastává u nákladové křivky po dobu životnosti inženýrských staveb. Nicméně je lépe dosažitelná, je věrohodněji konstruovatelná.
  • Náklady životního cyklu v provozní fázi investic jsou obvykle vyšší než pořizovací investiční náklady stavebního inženýrského díla. Specifikem inženýrských projektů bývá absence přehledné kalkulace výnosové funkce za dobu životnosti stavebního díla. Pravidla klasické ekonomiky investic se tak dostávají do úrovně expertních odhadů potenciální efektivnosti. Problematika se týká zejména obecních komunálních nebo regionálních rozhodnutí o infrastruktuře dopravních a jiných staveb potřebných pro faktický nebo hypotetický rozvoj průmyslu, bydlení apod. Obdobná situace nastává u nákladové křivky po dobu životnosti inženýrských staveb. Nicméně je lépe dosažitelná, je věrohodněji konstruovatelná. (cs)
Title
  • Life cycle costs of engineering works (en)
  • Náklady životního cyklu inženýrských staveb
  • Náklady životního cyklu inženýrských staveb (cs)
skos:prefLabel
  • Life cycle costs of engineering works (en)
  • Náklady životního cyklu inženýrských staveb
  • Náklady životního cyklu inženýrských staveb (cs)
skos:notation
  • RIV/68407700:21110/13:00206397!RIV14-MSM-21110___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • I
http://linked.open...iv/cisloPeriodika
  • 5
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 90506
http://linked.open...ai/riv/idVysledku
  • RIV/68407700:21110/13:00206397
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • bridge; LCC; TCO; engineering works (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [045134D65848]
http://linked.open...i/riv/nazevZdroje
  • Stavební obzor
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 2013
http://linked.open...iv/tvurceVysledku
  • Beran, Václav
  • Macek, Daniel
  • Měšťanová, Dana
issn
  • 1210-4027
number of pages
http://localhost/t...ganizacniJednotka
  • 21110
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 38 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software