About: Probabilistic models for tunnel construction risk assessment     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
rdfs:seeAlso
Description
  • The paper introduces different probabilistic models for prediction of tunnel construction risk. First, a simple probabilistic model for the estimation of the damage due to tunnel construction failures (e.g. cave-in collapses) is proposed. It can be used in conjunction with a deterministic estimate of the construction time/costs as a support for decision-making in tunnel construction projects. The occurrence of failures is modelled as an inhomogeneous Poisson process. The model takes into account the heterogeneity of the environment along the tunnel (changing geological conditions, changing damage potential) and it includes the influence of common factors such as human and organisational aspects. The damages caused by the failures are modelled as uncertain and they are thus represented by full probability distributions in the model. Second, the decision-making under uncertainty in construction projects is discussed. The use of the concept of utility for considering the attitude of the stakeholder to risk is demonstrated. The simple probabilistic model and the decision-making concept are applied to a case study of construction of a 480-m-long tunnel. Third, stochastic models for specific problems of tunnel construction, such as impacts ofhttps://www.vvvs.cvut.cz/aplikace/images/vyber.jpg excavation on surface structures or probabilistic prediction of thickness of rock overburden, are introduced. The use of the models is illustrated on an example from Blanka tunnel in Prague.
  • The paper introduces different probabilistic models for prediction of tunnel construction risk. First, a simple probabilistic model for the estimation of the damage due to tunnel construction failures (e.g. cave-in collapses) is proposed. It can be used in conjunction with a deterministic estimate of the construction time/costs as a support for decision-making in tunnel construction projects. The occurrence of failures is modelled as an inhomogeneous Poisson process. The model takes into account the heterogeneity of the environment along the tunnel (changing geological conditions, changing damage potential) and it includes the influence of common factors such as human and organisational aspects. The damages caused by the failures are modelled as uncertain and they are thus represented by full probability distributions in the model. Second, the decision-making under uncertainty in construction projects is discussed. The use of the concept of utility for considering the attitude of the stakeholder to risk is demonstrated. The simple probabilistic model and the decision-making concept are applied to a case study of construction of a 480-m-long tunnel. Third, stochastic models for specific problems of tunnel construction, such as impacts ofhttps://www.vvvs.cvut.cz/aplikace/images/vyber.jpg excavation on surface structures or probabilistic prediction of thickness of rock overburden, are introduced. The use of the models is illustrated on an example from Blanka tunnel in Prague. (en)
Title
  • Probabilistic models for tunnel construction risk assessment
  • Probabilistic models for tunnel construction risk assessment (en)
skos:prefLabel
  • Probabilistic models for tunnel construction risk assessment
  • Probabilistic models for tunnel construction risk assessment (en)
skos:notation
  • RIV/68407700:21110/13:00206326!RIV14-TA0-21110___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • P(TA01030245)
http://linked.open...iv/cisloPeriodika
  • Aug-Sept
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 99665
http://linked.open...ai/riv/idVysledku
  • RIV/68407700:21110/13:00206326
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • Tunnelling; Construction project; Failure rate; Probabilistic modelling; Risk assessment; Decision-making; Utility; Human factor (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • GB - Spojené království Velké Británie a Severního Irska
http://linked.open...ontrolniKodProRIV
  • [13B445824746]
http://linked.open...i/riv/nazevZdroje
  • Advances in Engineering Software
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...vavai/riv/projekt
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 62-63
http://linked.open...iv/tvurceVysledku
  • Novotná, Eva
  • Šejnoha, Michal
  • Šejnoha, Jiří
  • Špačková, Olga
http://linked.open...ain/vavai/riv/wos
  • 000321419500009
issn
  • 0965-9978
number of pages
http://bibframe.org/vocab/doi
  • 10.1016/j.advengsoft.2013.04.002
http://localhost/t...ganizacniJednotka
  • 21110
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 25 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software