About: Discussion with the paper Project costs planning in the conditions of uncertainty by H. Štiková     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • In the paper, there is analysed one particular approach to the modelling uncertainty in the project management through an original version of the fuzzy CPM (Critical Path Method). First there is shown the relevance of using the fuzzy CPM in agriculture and the related branches and present the basics of the methods used. Th en, there are described the imperfections of the work which is discussed and the impacts of the previously-published approach when applied in project management practice are emphasised. In the original paper, the author uses only the discrete fuzzy numbers for aktivity time durations which could be considered inappropriate for the time scheduling in project management. Consecutively, the direct application of the extension principle on the comparison of continuous durations could lead to the situation when both numbers can be greater than the second one with possibility equal to one. Moreover, the simple transformation of durations to the costs by linear equations with a positive s
  • In the paper, there is analysed one particular approach to the modelling uncertainty in the project management through an original version of the fuzzy CPM (Critical Path Method). First there is shown the relevance of using the fuzzy CPM in agriculture and the related branches and present the basics of the methods used. Th en, there are described the imperfections of the work which is discussed and the impacts of the previously-published approach when applied in project management practice are emphasised. In the original paper, the author uses only the discrete fuzzy numbers for aktivity time durations which could be considered inappropriate for the time scheduling in project management. Consecutively, the direct application of the extension principle on the comparison of continuous durations could lead to the situation when both numbers can be greater than the second one with possibility equal to one. Moreover, the simple transformation of durations to the costs by linear equations with a positive s (en)
Title
  • Discussion with the paper Project costs planning in the conditions of uncertainty by H. Štiková
  • Discussion with the paper Project costs planning in the conditions of uncertainty by H. Štiková (en)
skos:prefLabel
  • Discussion with the paper Project costs planning in the conditions of uncertainty by H. Štiková
  • Discussion with the paper Project costs planning in the conditions of uncertainty by H. Štiková (en)
skos:notation
  • RIV/60460709:41110/14:65187!RIV15-MSM-41110___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • S
http://linked.open...iv/cisloPeriodika
  • 11
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 11710
http://linked.open...ai/riv/idVysledku
  • RIV/60460709:41110/14:65187
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • project management, fuzzy critical path method, project costs, project schedule (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [64CE47B4CA0C]
http://linked.open...i/riv/nazevZdroje
  • Agricultural Economics (Zemědělská ekonomika)
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 60
http://linked.open...iv/tvurceVysledku
  • Houška, Milan
  • Krejčí, Igor
http://linked.open...ain/vavai/riv/wos
  • 0
issn
  • 0139-570X
number of pages
http://localhost/t...ganizacniJednotka
  • 41110
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software