About: A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • Project scheduling with limited resources is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can also be used if the durations are changed as a result of process implementation.
  • Project scheduling with limited resources is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can also be used if the durations are changed as a result of process implementation. (en)
  • Rozvrhování projektů s omezenými zdroji patří mezi NP-těžké optimalizační problémy. Existuje mnoho heuristických strategií, jak posouvat činnosti v čase, pokud požadavky na zdroje překračují jejich disponibilní množství. Tyto strategie jsou často založeny na prioritách činností. V příspěvku předpokládáme, že již byla zvolena vhodná heuristika pro rozhodnutí, které činnosti by se měly provést hned a které odsunout na pozdější dobu, a problém rozvrhování projektů s omezenými zdroji zkoumáme z implementačního pohledu. Navrhujeme efektivní proceduru, která místo posouvání činností v čase prodlužuje jejich trvání. To umožňuje rozdělit jejich provádění na aktivní a neaktivní subintervaly. Pak můžeme aplikovat klasickou metodu kritické cesty, jejíž potřebný čas výpočtu je polynomiální. Navržený algoritmus může být rovněž využit, jestliže se trvání činnost v průběhu provádění projektu mění. (cs)
Title
  • A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes
  • A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes (en)
  • Příspěvek k posuvným algoritmům pro rozvrhování s omezenými zdroji s dynamickými změnami (cs)
skos:prefLabel
  • A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes
  • A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes (en)
  • Příspěvek k posuvným algoritmům pro rozvrhování s omezenými zdroji s dynamickými změnami (cs)
skos:notation
  • RIV/00216305:26210/07:PU69334!RIV08-MSM-26210___
http://linked.open.../vavai/riv/strany
  • 401-405
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • Z(MSM0021630518)
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 407852
http://linked.open...ai/riv/idVysledku
  • RIV/00216305:26210/07:PU69334
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • resource-constrained scheduling, project management, NP-hard problem, CPM, heuristic method (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...ontrolniKodProRIV
  • [E94BD914E5C8]
http://linked.open...v/mistoKonaniAkce
  • Crete
http://linked.open...i/riv/mistoVydani
  • Crete Island (Greece)
http://linked.open...i/riv/nazevZdroje
  • Proceedings of the 11th WSEAS International Conference on Systems
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...iv/tvurceVysledku
  • Šeda, Miloš
http://linked.open...vavai/riv/typAkce
http://linked.open.../riv/zahajeniAkce
http://linked.open...n/vavai/riv/zamer
number of pages
http://purl.org/ne...btex#hasPublisher
  • WSEAS Press
https://schema.org/isbn
  • 978-960-8457-90-4
http://localhost/t...ganizacniJednotka
  • 26210
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software