Attributes | Values |
---|
rdf:type
| |
Description
| - The Hochbrücke (Highway Bridge) in Wismar was built in 1970 as the longest prestressed concrete bridge in the former GDR. It is 396 m long, comprises of 15 fields, which rest on deep foundations. The bridge as a part of the road B 105 leads the traffic across railway tracks, a street and the Mühlenteich (engl. = mill pond). After reunification of Germany the Hochbrücke was checked in the course of the exploration of the state of bridges in Mecklenburg-Pomerania concerning damages due to alkali silica reaction (ASR). In 2001 the bridge was investigated in detail by the Building Department of University Rostock, and the damages were assessed as reparable. The required remediation work was carried out in 2005. Six years later the Federal Ministry of Transport Building and Urban Development of Germany has issued Instructions for inspection and assessment of old bridges, that were erected with the tempered prestressing steel endangered by stress cracking corrosion (SCC). The obligatory investigations of
- The Hochbrücke (Highway Bridge) in Wismar was built in 1970 as the longest prestressed concrete bridge in the former GDR. It is 396 m long, comprises of 15 fields, which rest on deep foundations. The bridge as a part of the road B 105 leads the traffic across railway tracks, a street and the Mühlenteich (engl. = mill pond). After reunification of Germany the Hochbrücke was checked in the course of the exploration of the state of bridges in Mecklenburg-Pomerania concerning damages due to alkali silica reaction (ASR). In 2001 the bridge was investigated in detail by the Building Department of University Rostock, and the damages were assessed as reparable. The required remediation work was carried out in 2005. Six years later the Federal Ministry of Transport Building and Urban Development of Germany has issued Instructions for inspection and assessment of old bridges, that were erected with the tempered prestressing steel endangered by stress cracking corrosion (SCC). The obligatory investigations of (en)
|
Title
| - State Evaluation of the Hochbrucke Wismar in Terms of Reperability
- State Evaluation of the Hochbrucke Wismar in Terms of Reperability (en)
|
skos:prefLabel
| - State Evaluation of the Hochbrucke Wismar in Terms of Reperability
- State Evaluation of the Hochbrucke Wismar in Terms of Reperability (en)
|
skos:notation
| - RIV/00216305:26110/14:PU110091!RIV15-MSM-26110___
|
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| |
http://linked.open...iv/cisloPeriodika
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/00216305:26110/14:PU110091
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - bridge, state evaluation, repair, prestressed concrete, alkali-silica-reaction, prestressing steel, stress corrosion cracking (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...odStatuVydavatele
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...i/riv/nazevZdroje
| - Sanace betonových konstrukcí
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...vavai/riv/projekt
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...v/svazekPeriodika
| |
http://linked.open...iv/tvurceVysledku
| - Petránek, Vít
- Diederichs, Ulrich Martin
- Marquardt, Iris
|
issn
| |
number of pages
| |
http://localhost/t...ganizacniJednotka
| |