About: Limits of Usage of Cost-Benefit Analysis by Evaluation of Public Projects     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
rdfs:seeAlso
Description
  • The article deals with the issue of evaluation of public projects which is based on the method of Cost-benefit analysis. The future social benefits and costs of public projects (financed especially from funds of the European Union) are evaluated by means of this method. We can practically meet the approach of set of social benefits and costs which arise from the assessment of present relevant economies. These economies are consequently predicted on the whole time of life cycle of the project. At the same time we simplify when we assign the present benefits to the particular years of lifetime of the project (we only respect the discount rate). This article proposes to involve the approach of system dynamics in the prediction. The system dynamics searches the reality as the system when the particular items of system are mutual influenced. The feed backs are raised when the result of the activity influences the original cause by return. The integration of the system dynamics into the evaluation of social benefits and costs could improve the prediction. Because the efficiency allocation of public resources is the aim of evaluation of public projects, the usage of system dynamics could support the process of allocation.
  • The article deals with the issue of evaluation of public projects which is based on the method of Cost-benefit analysis. The future social benefits and costs of public projects (financed especially from funds of the European Union) are evaluated by means of this method. We can practically meet the approach of set of social benefits and costs which arise from the assessment of present relevant economies. These economies are consequently predicted on the whole time of life cycle of the project. At the same time we simplify when we assign the present benefits to the particular years of lifetime of the project (we only respect the discount rate). This article proposes to involve the approach of system dynamics in the prediction. The system dynamics searches the reality as the system when the particular items of system are mutual influenced. The feed backs are raised when the result of the activity influences the original cause by return. The integration of the system dynamics into the evaluation of social benefits and costs could improve the prediction. Because the efficiency allocation of public resources is the aim of evaluation of public projects, the usage of system dynamics could support the process of allocation. (en)
Title
  • Limits of Usage of Cost-Benefit Analysis by Evaluation of Public Projects
  • Limits of Usage of Cost-Benefit Analysis by Evaluation of Public Projects (en)
skos:prefLabel
  • Limits of Usage of Cost-Benefit Analysis by Evaluation of Public Projects
  • Limits of Usage of Cost-Benefit Analysis by Evaluation of Public Projects (en)
skos:notation
  • RIV/00216275:25410/14:39899140!RIV15-MSM-25410___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • I
http://linked.open...iv/cisloPeriodika
  • 31
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 26235
http://linked.open...ai/riv/idVysledku
  • RIV/00216275:25410/14:39899140
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • system dynamics; simulation; public projects; methods of evaluation; Cost-Benefit analysis (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...odStatuVydavatele
  • CZ - Česká republika
http://linked.open...ontrolniKodProRIV
  • [7B8475DA5FF1]
http://linked.open...i/riv/nazevZdroje
  • Scientific Papers of the University of Pardubice, Series D, Faculty of Economics and Administration
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...v/svazekPeriodika
  • 21
http://linked.open...iv/tvurceVysledku
  • Sobotková, Lucie
issn
  • 1211-555X
number of pages
http://localhost/t...ganizacniJednotka
  • 25410
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 38 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software