| - *The project is focused on research, development and next optimalization of measurement methods as well as available data sources, data acquisition and evaluation to enhance the possibility of the evaluation of the electrical equipment behaviour during prospective commissioning tests. The electrical equipment commissioning test methods should be primarily applied on large power plant units e.g. nuclear power plants. The complexity of electrical system of these plants (e.g. system automatics or protection) is on such level, that it is necessary an extra approach to design of electrical or other technological quantities as well as their sources (direct measurement, data communication etc.) and last but not least data acquisition equipment. The data acquisition equipment should also match these requirements. It is necessary to develop proper methods for the fast and effective evaluation and analysing of the acquired data. (en)
- *Projekt je zaměřen na výzkum, vývoj a následnou optimalizaci měřicích metod, dostupných zdrojů měřených signálů, způsobu jejich záznamu a vyhodnocení pro možnost posouzení správnosti chování elektrozařízení nebo jeho části při navržených zkouškách. Měřicí metody pro zkoušky zprovoznění elektrozařízení budou využity především při uvádění velkých elektrárenských bloků do provozu, jako jsou např. jaderné bloky, kde je složitost použitých elektrozařízení (např. automatiky a systémy chránění) na takové úrovni, že je nutné vhodně a správně navrhnout měřené elektrické a případně technologické signály, jejich zdroje (přímé měření, datovou komunikaci apod.) a v neposlední řadě i vhodnou záznamovou techniku, která bude splňovat svými parametry požadavky na záznam určených signálů. Zároveň bude nutné vyvinout vhodné metody a metodiky pro jejich rychlé a efektivní vyhodnocování a analýzu. (cs)
|
Title
| - *Research and development of advanced electrical equipment test methods for nuclear and coal power plant units commisioning (en)
- *Výzkum a vývoj progresivních metod pro zkoušky elektrického zařízení jaderných i klasických elektrárenských bloků při uvádění do provozu (cs)
|
http://linked.open...vai/cislo-smlouvy
| |
http://linked.open...avai/druh-souteze
| |
http://linked.open...domain/vavai/faze
| |
http://linked.open...vavai/hlavni-obor
| |
http://linked.open...vai/vedlejsi-obor
| |
http://linked.open...i/hlavni-ucastnik
| |
http://linked.open...vavai/id-aktivity
| |
http://linked.open.../vavai/id-souteze
| |
http://linked.open...n/vavai/kategorie
| |
http://linked.open...vai/klicova-slova
| - electrical equipment; power plant; power unit; monitoring; diagnostics; data acquisition; data pocessing; data source; measurement; data communication; reliability; safety (en)
|
http://linked.open...avai/konec-reseni
| |
http://linked.open...nujicich-prijemcu
| |
http://linked.open...avai/poskytovatel
| |
http://linked.open...avai/start-reseni
| |
http://linked.open...ai/statni-podpora
| |
http://linked.open...vavai/typProjektu
| |
http://linked.open...ai/uznane-naklady
| |
http://linked.open...ai/pocet-prijemcu
| |
http://linked.open...cet-spoluprijemcu
| |
http://linked.open...ai/pocet-vysledku
| |
http://linked.open...ku-zverejnovanych
| |
is http://linked.open...ain/vavai/projekt
of | |