Attributes | Values |
---|
rdf:type
| |
Description
| - Particular functional blocks of Large-Scale Alarm receiving Centre modernization Design creates core contribution of this research paper. In the introductory chapter the valid legislation and the resulting requirements for the design, location, construction, technical equipment, operations and personnel are described. Moreover, the methodology of evaluation of the Alarm receiving Centre quality is proposed and applied to the particular company. The particular modernization related to selected areas such as communication or ergonomic layout of the workplace is then specified on the basis of the evaluation results. Moreover, the design of particular renovations is provided, including appropriately chosen technology and manufacturer, respectively provider.
- Particular functional blocks of Large-Scale Alarm receiving Centre modernization Design creates core contribution of this research paper. In the introductory chapter the valid legislation and the resulting requirements for the design, location, construction, technical equipment, operations and personnel are described. Moreover, the methodology of evaluation of the Alarm receiving Centre quality is proposed and applied to the particular company. The particular modernization related to selected areas such as communication or ergonomic layout of the workplace is then specified on the basis of the evaluation results. Moreover, the design of particular renovations is provided, including appropriately chosen technology and manufacturer, respectively provider. (en)
|
Title
| - Large-scale industrial company alarm receiving centre modernization design
- Large-scale industrial company alarm receiving centre modernization design (en)
|
skos:prefLabel
| - Large-scale industrial company alarm receiving centre modernization design
- Large-scale industrial company alarm receiving centre modernization design (en)
|
skos:notation
| - RIV/70883521:28140/14:43871911!RIV15-MSM-28140___
|
http://linked.open...avai/riv/aktivita
| |
http://linked.open...avai/riv/aktivity
| |
http://linked.open...iv/cisloPeriodika
| |
http://linked.open...vai/riv/dodaniDat
| |
http://linked.open...aciTvurceVysledku
| |
http://linked.open.../riv/druhVysledku
| |
http://linked.open...iv/duvernostUdaju
| |
http://linked.open...titaPredkladatele
| |
http://linked.open...dnocenehoVysledku
| |
http://linked.open...ai/riv/idVysledku
| - RIV/70883521:28140/14:43871911
|
http://linked.open...riv/jazykVysledku
| |
http://linked.open.../riv/klicovaSlova
| - Security Assessment; Modernization; Evaluation; Ergonomic; Alarm Receiving Centre Design (en)
|
http://linked.open.../riv/klicoveSlovo
| |
http://linked.open...odStatuVydavatele
| |
http://linked.open...ontrolniKodProRIV
| |
http://linked.open...i/riv/nazevZdroje
| - WSEAS Transactions on Communications
|
http://linked.open...in/vavai/riv/obor
| |
http://linked.open...ichTvurcuVysledku
| |
http://linked.open...cetTvurcuVysledku
| |
http://linked.open...UplatneniVysledku
| |
http://linked.open...v/svazekPeriodika
| |
http://linked.open...iv/tvurceVysledku
| - Svoboda, Petr
- Ševčík, Jiří
- Malus, Martin
|
issn
| |
number of pages
| |
http://localhost/t...ganizacniJednotka
| |