About: Life Cycle Cost optimization within decision making on alternative designs     Goto   Sponge   Distinct   Permalink

An Entity of Type : http://linked.opendata.cz/ontology/domain/vavai/Vysledek, within Data Space : linked.opendata.cz associated with source document(s)

AttributesValues
rdf:type
Description
  • The purpose of this paper is to highlight the role of the life cycle cost criterion in deciding on the proposals of construction projects. Owners commonly use construction cost minimization. In order to achieve the maximum value for money all costs incurred over the whole life span must be evaluated. The optimization of the life-cycle cost of a project, construction, and equipment is essential for a complex decision-making process. Then, the solution with the minimum value of the life-cycle cost can be chosen. Life cycle costing (LCC) is a method of economic analyzing of all costs related to constructing, operating, and maintaining a construction project over a defined period of time. Having the costs and savings we can then directly compared these areas and be fully informed when decisions are made. The greatest benefit of life cycle costing can be obtained in the initiation phase of construction projects. The paper summarizes the issues of life cycle costing (LCC) and analyzing. The paper presents the most frequently used methods of cost calculating. The paper also clarifies the necessary data and a suitable process of life cycle costing is proposed. The paper presents the results of a survey focused on the use of LCC by public owners and developers. Decision-making using the LCC optimization is demonstrated in the case study. This case study is a public building. The client’s benefits of integrating LCC into decision-making processes within project preparation are summarized in the conclusion.
  • The purpose of this paper is to highlight the role of the life cycle cost criterion in deciding on the proposals of construction projects. Owners commonly use construction cost minimization. In order to achieve the maximum value for money all costs incurred over the whole life span must be evaluated. The optimization of the life-cycle cost of a project, construction, and equipment is essential for a complex decision-making process. Then, the solution with the minimum value of the life-cycle cost can be chosen. Life cycle costing (LCC) is a method of economic analyzing of all costs related to constructing, operating, and maintaining a construction project over a defined period of time. Having the costs and savings we can then directly compared these areas and be fully informed when decisions are made. The greatest benefit of life cycle costing can be obtained in the initiation phase of construction projects. The paper summarizes the issues of life cycle costing (LCC) and analyzing. The paper presents the most frequently used methods of cost calculating. The paper also clarifies the necessary data and a suitable process of life cycle costing is proposed. The paper presents the results of a survey focused on the use of LCC by public owners and developers. Decision-making using the LCC optimization is demonstrated in the case study. This case study is a public building. The client’s benefits of integrating LCC into decision-making processes within project preparation are summarized in the conclusion. (en)
Title
  • Life Cycle Cost optimization within decision making on alternative designs
  • Life Cycle Cost optimization within decision making on alternative designs (en)
skos:prefLabel
  • Life Cycle Cost optimization within decision making on alternative designs
  • Life Cycle Cost optimization within decision making on alternative designs (en)
skos:notation
  • RIV/68407700:21110/14:00219620!RIV15-MSM-21110___
http://linked.open...avai/riv/aktivita
http://linked.open...avai/riv/aktivity
  • S
http://linked.open...vai/riv/dodaniDat
http://linked.open...aciTvurceVysledku
http://linked.open.../riv/druhVysledku
http://linked.open...iv/duvernostUdaju
http://linked.open...titaPredkladatele
http://linked.open...dnocenehoVysledku
  • 26157
http://linked.open...ai/riv/idVysledku
  • RIV/68407700:21110/14:00219620
http://linked.open...riv/jazykVysledku
http://linked.open.../riv/klicovaSlova
  • Building; cost; design; decision; life cycle (en)
http://linked.open.../riv/klicoveSlovo
http://linked.open...ontrolniKodProRIV
  • [67A95947B5F3]
http://linked.open...v/mistoKonaniAkce
  • Prague
http://linked.open...i/riv/mistoVydani
  • Budapest
http://linked.open...i/riv/nazevZdroje
  • Proceedings of the Creative Construction Conference 2014
http://linked.open...in/vavai/riv/obor
http://linked.open...ichTvurcuVysledku
http://linked.open...cetTvurcuVysledku
http://linked.open...UplatneniVysledku
http://linked.open...iv/tvurceVysledku
  • Schneiderová Heralová, Renáta
http://linked.open...vavai/riv/typAkce
http://linked.open.../riv/zahajeniAkce
number of pages
http://purl.org/ne...btex#hasPublisher
  • Diamond Congress Kft.
https://schema.org/isbn
  • 978-963-269-434-4
http://localhost/t...ganizacniJednotka
  • 21110
Faceted Search & Find service v1.16.118 as of Jun 21 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 07.20.3240 as of Jun 21 2024, on Linux (x86_64-pc-linux-gnu), Single-Server Edition (126 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software