In this talk we survey the area of scheduling with the objective to maximize the throughput, i.e., the (weighted) number of completed jobs. We focus on several open problems.
In this talk we survey the area of scheduling with the objective to maximize the throughput, i.e., the (weighted) number of completed jobs. We focus on several open problems. (en)